This is the shadow level of my Ruhr Valley layout. I have drafted it in Roco Line although in the real world it's a mix of Atlas and Fleischmann track. Roco Line will be used exclusively in the upper level. Purpose of the shadow level is to hold up to 12 trains that can be called up. The longest train is the "Langer Heinrich" with two BR 44s and 24 iron ore trucks which has two special parking spot on the sub-level. Track length so far is 113 m.
I am almost finished building the sub level and will soon move on to plan the upper level.
(Edited for better readability)
Ruhr Lower